Nam Emoun Dam

Nam Emoun Dam

Nam Emoun hydropower project is built in Nam Emoun and Hoyay River of Sekong province, Laos PDR. This project has the installed capacity of 129 MW, the average annual energy output of 427, 4 GWH. The project consists of main structures such as Diversion dam, Main dam, Waterway with the tunnel length of 20 km, Powerhouse, Switchyard etc. The contract performance time shall be within 3 years (from 2019 to 2021).

Location of Project: Lao
Application time: 2021
Project Owner: Chaleun Sekong Energy Co., Ltd
Project type: Industrial
Products/System Used: Nullifire SC902